Navigation Menu
- Home
-
About Us
- ONGC at a Glance
- ONGC Group of Companies
- Vision and Mission
- Our Growth Story
- Board of Directors
- Board Level Committees
- Chief Vigilance Officer (CVO)
- Core Business Expertise
- New initiatives in Energy
- Organogram
- Technology
- Subsidiaries
- JVs
- Performance
- Recognitions and Ranks
- Contact us
- Interface
-
Institutes
-
IDT
- About IDT
-
Well Control School
- About Well Control School
- IWCF-RD Course
- IWCF-WIP Course
- IADC Wellsharp Driller & Supervisor Course
- Introductory IWCF & IADC Well control Rotary Drilling courses
- Introductory Well Servicing Course
- IADC Well Sharp Well Servicing Workover Course
- Course Fees and Bank Details
- Schedule
- Results
- Online Payment
- Contact detail & course fee
- Candidate Registration Guide
- Drilling Technology School
- KDMIPE
- CEWELL
- GEOPIC
- IRS
- INBIGS
- IOGPT
- IPEOT
- IEOT
- Advanced Training Institute (ATI)
- IDT
- SMP
- ONGC Academy
-
IDT
- In touch
- History
- Material Management
- ONGC Sports
- Offshore Engineering Services-Vendor Check List
- Sustainability
- CSR
-
Investors
- Shareholding Pattern
- Dividend Information
- AGM
- Policies
- Notice
- Investor Contacts (Investor Grievance Redressal)
- Independent Directors
- Annual Reports
- Investor / Analyst Presentation
- Intimation to Stock Exchange(s)
- IEPF Details
- Performance
- KYC Updation Forms
- Credit Rating
- Annual Return
- Non - Convertible Debentures (NCDs)
- Loss of share certificate(s)
- 31st AGM - Inspection Documents
- ODR Portal for Investors
- Memorandum and Articles of Association
- Media
- Career
- Pay
- Inauguration
- Northeast Gas subsidy
- Sea Survival Training
- Net Zero
- 31st Inspection
- 31stAGM
- ONGC-Documents
- Forex Bank Empanelment
Latest Tweets
Asset Publisher
On 21.01.2011, a leakage was detected at ONGC's Mumbai Uran Trunk (MUT) oil pipeline. The leakage was observed around 2 kms from BPB platform (Bassein oil and gas field) in Western Offshore, 80 kms from Mumbai Coast.
The production from Mumbai High was resumed by diverting oil to ICP Heera Uran Trunk (HUT) pipeline. Some of the wells were kept closed due to operational constraints. The loss of production was around 25,000 bopd on the day of incident.
ONGC mobilized a tanker for augmenting the production which was deployed by SCI on 23.01.2011 at SHD platform. The current production as on date is around 312,000 bopd from Western Offshore and expected to reach around 317,000 bopd by late evening which is around 3,000 bopd less than average normal production.
ONGC has prepared the short term and long term action plan for repair of MUT line. The short term repair is expected to get completed in another week's time as the permanent repair may take considerable time based on the availability of the long lead materials.
However, surveillance and monitoring of operations shall continue till the line is permanently repaired/ restored.
Issued By
Oil and Natural Gas Corporation Ltd.
Corporate Communications, New Delhi,
Phone: +91-11-23320032
Tele-Fax: 011-23357860
Mail: ongcdelhicc@ongc.co.in