Navigation Menu

Latest Tweets

clean-development-mechanism

ONGC Clean Development Mechanism

ONGC was the first PSU in the country to have taken a lead in the area of Clean Development Mechanism. Company commenced its Clean Development Mechanism (CDM) journey in 2006. Currently, it has 15 registered CDM projects with the United Nations Framework Convention on Climate Change (UNFCCC) that yield (potential) Certified Emissions Reductions (CER) approx. 2.1 million yearly. The registered CDM projects are as under:

S. No. Projects CER/annum
1 1 Waste heat recovery from Process Gas Compressors (PGCs), Mumbai high south (offshore platform). 5320
2 Up-gradation of Gas Turbine 1 (GT 1) and Gas Turbine 2 (GT 2) at co-generation plant of Hazira Gas Processing Complex (HGPC). 7802
3 Flare gas recovery project at Uran plant. 97740
4 Flare gas recovery project at Hazira Gas Processing Complex (HGPC), Hazira plant. 8793
5 Amine Circulation Pumps Energy Efficiency at Hazira Plant. 4043
6 51 MW wind power project of ONGC at Surajbari. 85762
7 Energy Efficient Green Building at Mumbai. 544
8 Energy Efficient Green Building at Dehradun. 735
9 Gas Flaring Reduction at Neelam & Heera Asset. 65811
10 OTPC Natural gas based combined cycle power plant in Tripura, India. 1612506
11 Energy Efficient Green Building at Kolkata. 1881
12 Energy Efficient Green Building at Delhi. 5944
13 Gas flare reduction at GGS Charali Assam. 15172
14 Replacement of MOL pumps at Neelam and Heera. 10539
15 102 MW Wind Power project at Jaisalmer, Rajasthan. 180177
  Total 2102769

 

Four production installations (CPF Gandhar, Gandhar GGS-I, Ankleshwar CTF, and Nawagam CTF) were declared carbon neutral for the year 2015-16 after voluntarily retiring 1,34,419 CERs of CP-1 credit period from CDM registry account (UNFCC).

Sustainable Water Management (SWM)

As an E&P Company, the Company business depends on sustainability of fresh water resources which are presently under pressure. Globally, per capita availability of freshwater is steadily decreasing and trend will inevitably continue with the increasing consumption levels and climate change unfolds. In this situation, it is imperative for the Company to develop new strategies for water management in order to achieve sustainable growth and development. The details of existing rain water harvesting projects of the Company are given below.

  • 29 ground water recharge wells at various locations of Ahmedabad Asset.
  • Rain water from rooftop and surface run off harvesting at Green Building, Mumbai.
  • Percolation well for bore well recharge at Residential complex, Ankleshwar Asset.
  • Rain water harvesting system as integral part of C2-C3 plant, Dahej, Gujarat.
  • Rain water harvesting at Rajahmundry Asset base complex.
  • 16 infiltration well in IPSHEM, Goa.
  • 2 ground water recharge wells at IRS, Ahmedabad.
  • 6 ground water recharge wells at KDMIPE, Dehradun.
  • 1 ground water recharge well at base complex, RFB, Jodhpur.
  • RWH system at K. V. School, NOBH and officers’ club at Agartala, Tripura Asset.
  • RWH system, PPCL building, Uran Plant, Raigad, Maharashtra.
  • Bhavale Hill RWH system, Panvel, Maharashtra.
  • RWH system at SPIC campus, Panvel, Maharashtra.
  • RWH systems at various locations at Western Onshore Basin, Vadodara.