Navigation Menu
- Home
-
About Us
- ONGC at a Glance
- ONGC Group of Companies
- Vision and Mission
- Our Growth Story
- Board of Directors
- Board Level Committees
- Chief Vigilance Officer (CVO)
- Core Business Expertise
- New initiatives in Energy
- Organogram
- Technology
- Subsidiaries
- JVs
- Performance
- Recognitions and Ranks
- Contact us
- Interface
-
Institutes
-
IDT
- About IDT
-
Well Control School
- About Well Control School
- IWCF-RD Course
- IWCF-WIP Course
- IADC Wellsharp Driller & Supervisor Course
- Introductory IWCF & IADC Well control Rotary Drilling courses
- Introductory Well Servicing Course
- IADC Well Sharp Well Servicing Workover Course
- Course Fees and Bank Details
- Schedule
- Results
- Online Payment
- Contact detail & course fee
- Candidate Registration Guide
- Drilling Technology School
- KDMIPE
- CEWELL
- GEOPIC
- IRS
- INBIGS
- IOGPT
- IPEOT
- IEOT
- Advanced Training Institute (ATI)
- IDT
- SMP
- ONGC Academy
-
IDT
- In touch
- History
- Material Management
- ONGC Sports
- Offshore Engineering Services-Vendor Check List
- Sustainability
- CSR
-
Investors
- Shareholding Pattern
- Dividend Information
- AGM
- Policies
- Notice
- Investor Contacts (Investor Grievance Redressal)
- Independent Directors
- Annual Reports
- Investor / Analyst Presentation
- Intimation to Stock Exchange(s)
- IEPF Details
- Performance
- KYC Updation Forms
- Credit Rating
- Annual Return
- Non - Convertible Debentures (NCDs)
- Loss of share certificate(s)
- 31st AGM - Inspection Documents
- ODR Portal for Investors
- Memorandum and Articles of Association
- Media
- Career
- Pay
- Inauguration
- Northeast Gas subsidy
- Sea Survival Training
- Net Zero
- 31st Inspection
- 31stAGM
- ONGC-Documents
- Forex Bank Empanelment
Latest Tweets
Asset Publisher
ONGC Jeetega to Bharat Jeetega!
ONGC announces the successful commencement of “First Oil” from the deep-water KG-DWN-98/2 Block, situated off the coast of Bay of Bengal. This 98/2 project is likely to increase ONGC’s total Oil and Gas production by 11 percent and 15 percent respectively.
Valiantly combating various technological and Covid-related challenges, ONGC had successfully executed Phase 1 of the project in March 2020, achieving the commencement of gas production from U field of the KG-DWN-98/2 Block in record time of 10 months.
With commencement of this First Oil on 7 January 2024, ONGC is nearing completion of Phase 2, culminating into commencement of oil production from the ‘M’ field of KG-DWN-98/2.
The development of this field faced unique technical challenges due to the waxy nature of the crude. To overcome those, ONGC employed innovative Pipe in Pipe technology, a first-of-its-kind initiative in India. While some subsea hardware involved in this development has been sourced internationally to meet specific requirements, the majority of fabrication works were carried out at Modular Fabrication Facility at Kattupalli which highlights ONGC's commitment to promote ‘Make in India’, contributing towards a self-reliant energy sector in India.
The flagship project is on track with Final phase of project with the balance oil & gas fields of the block scheduled to be put on production by mid 2024. Peak production of field is expected to be 45,000 barrels of oil per day (bopd) and over 10 MMSCMD of gas, which will contribute significantly towards the vision of Hon’ble PM of an energy Aatmanirbhar Bharat.
Issued by:
ONGC Ltd