Navigation Menu
- Home
-
About Us
- ONGC at a Glance
- ONGC Group of Companies
- Vision and Mission
- Our Growth Story
- Board of Directors
- Board Level Committees
- Chief Vigilance Officer (CVO)
- Core Business Expertise
- New initiatives in Energy
- Organogram
- Technology
- Subsidiaries
- JVs
- Performance
- Recognitions and Ranks
- Contact us
- Interface
-
Institutes
-
IDT
- About IDT
-
Well Control School
- About Well Control School
- IWCF-RD Course
- IWCF-WIP Course
- IADC Wellsharp Driller & Supervisor Course
- Introductory IWCF & IADC Well control Rotary Drilling courses
- Introductory Well Servicing Course
- IADC Well Sharp Well Servicing Workover Course
- Course Fees and Bank Details
- Schedule
- Results
- Online Payment
- Contact detail & course fee
- Candidate Registration Guide
- Drilling Technology School
- KDMIPE
- CEWELL
- GEOPIC
- IRS
- INBIGS
- IOGPT
- IPEOT
- IEOT
- Advanced Training Institute (ATI)
- IDT
- SMP
- ONGC Academy
-
IDT
- In touch
- History
- Material Management
- ONGC Sports
- Offshore Engineering Services-Vendor Check List
- Sustainability
- CSR
-
Investors
- Shareholding Pattern
- Dividend Information
- AGM
- Policies
- Notice
- Investor Contacts (Investor Grievance Redressal)
- Independent Directors
- Annual Reports
- Investor / Analyst Presentation
- Intimation to Stock Exchange(s)
- IEPF Details
- Performance
- KYC Updation Forms
- Credit Rating
- Annual Return
- Non - Convertible Debentures (NCDs)
- Loss of share certificate(s)
- 31st AGM - Inspection Documents
- ODR Portal for Investors
- Memorandum and Articles of Association
- Media
- Career
- Pay
- Inauguration
- Northeast Gas subsidy
- Sea Survival Training
- Net Zero
- 31st Inspection
- 31stAGM
- ONGC-Documents
- Forex Bank Empanelment
Latest Tweets
Asset Publisher
ONGC commences evacuation of oil from Panna field through newly laid sub-sea pipeline on Arabian Sea
Oil and Natural Gas Corporation Ltd (ONGC), India’s Energy Maharatna, today announced a significant milestone with the successful linkage of Panna Process Platform with subsea pipeline, a part of ONGC’s Bassein & Satellite (B&S) Asset.
ONGC has achieved a significant cost reduction of approximately USD 43,000 per day by connecting the platform with subsea pipeline. Additionally, the submarine pipeline connection minimizes the production downtime associated with tanker changeovers and eliminates demurrage charges during adverse weather conditions.
These combined savings and improved operational agility position ONGC for long-term success in the offshore oil and gas sector.
The Panna segment includes laying of 2 segments of 37.50 kms of submarine pipeline and installation of 3 Main Oil Line Pumps (MOL) and 3 booster pumps.
The Panna-Mukta oilfield consists of two adjacent offshore oil fields north-west of Mumbai.
This remarkable feat is a triumph for ONGC and underscores its commitment to technological advancement and ushering in operational excellence in the oil and gas industry to raise output and further secure India's energy interest.